• Skip to primary navigation
  • Skip to main content
  • Skip to footer
  • RE-OPEN STRATEGIES
  • Careers
  • ATS Companies
  • (425) 251-9680
  • Facebook
  • LinkedIn
  • Constant Contact
  • Search

ATS Automation

Smart Building Control Systems Serving Western and Central Washington

Building Solutions


  • Controls
  • Energy Optimization
  • Service
  • Home
  • About
    • ATS Companies
    • Vision & Values
    • Team
    • Community
    • Careers
    • Testimonials
  • Solutions
    • Construction
    • Critical Facilities & Data Centers
    • Energy Management
      • Washington Clean Buildings Performance Standard (HB-1257)
    • Smart Building Solutions
      • FacilityAI Autonomous Optimization
    • Consulting Services
  • Support
    • 24/7 Service
    • Service Programs
    • Training
    • Operational Tech
      • FacilityHost
      • FacilityShield
  • Projects
  • Products
  • Contact
  • (425) 251-9680
  • Facebook
  • LinkedIn
  • Constant Contact

Lab/Critical Environment Projects

Lab/Critical Environment

Center for Urban Waters LEED Project

Center for Urban Waters

November 8, 2018

Designed for Sustainability

Center for Urban Waters Project HighlightsLocated on Commencement Bay in Tacoma, the Center for Urban Waters (CUW) is a 51,000 SQFT research facility dedicated to rain water collection and testing, environmental studies, and protecting the Puget Sound. The facility is home to City of Tacoma Environmental Services,

University of Washington Tacoma researchers and the Puget Sound Partnership. The three CUW tenants function as a partnership bringing together researchers, policy makers and engineers to develop and implement solutions protecting the Puget Sound. During construction, CUW focused on building a sustainable and energy efficient building. Once construction was completed, the U.S Green Building Council (USGBC) certified the CUW facility as LEED Platinum NC, the highest rating a newly built facility can obtain.

ATS & Center for Urban Waters

ATS Automation has been involved with the CUW since 2009 when construction on the facility began. Because efficiency and environmental advocacy is critical to CUW, ATS spent extra time as construction was nearing completion to include the ATS Service Group in close out activities and meetings. Involving the service team during construction allowed CUW to transition to daily operations while having a controls service team already primed to support and keep the facility running efficiently for the long term.

In addition to regular preventative maintenance service, CUW utilizes several ATS energy offerings to ensure building performance remains optimal. ATS developed and installed a dashboard in the building’s lobby that dynamically updates to show energy usage. As a taxpayer funded facility this is a valuable tool used to demonstrate facility efficiency to the public. ATS also deployed facilityCARE; a service that identifies energy and cost saving opportunities through ongoing monitoring-based commissioning, advanced fault detection, reporting, energy monitoring and analytics. As part of this service ATS holds monthly system performance reviews with building engineers. Using facilityCARE allows ATS to proactively identify system inefficiencies and areas of improvement that would not have been detected during normal maintenance activities.

The work performed by ATS has allowed CUW to maintain a high building efficiency standard as well as prepare building operators for when they need to recertify the LEED status for the facility. LEED certifications renew every 5 years and since CUW is now occupied and serves as both office and laboratory space there were new challenges to address. LEED does not have provisions for how to report lab space usage combined with office space. Since the lab maintains 28 fume hoods for testing, the AHU runs 24 hours a day. This AHU usage obscured the energy efficiencies of the office space. ATS served as a consultant during the recertification process providing documentation and data collection to the CUW team. ATS also performed calculations to separate the lab usage from the office space so a more accurate reporting to the USGBC could be made. The facility ended up certifying as LEED Gold EB+C. Because conservation is a key part of the buildings purpose, building management’s goal now is to improve operation so that the facility will achieve platinum status again. To achieve this CUW is utilizing ATS Support & Energy Services to fine tune operations and discover trouble areas before they become long-term problems.

Due to the long-term relationship between ATS and CUW the facility continues to perform at a high level. By incorporating ATS Service into the closeout process of construction, CUW was able to seamlessly transition to normal building use and occupation. By performing preventative maintenance, maintaining building records and incorporating energy services, CUW doesn’t have to perform catchup every time they need to reevaluate the building. Now with a goal of achieving LEED Platinum, ATS and CUW will focus their future time and energy on further optimizing the building using insights gathered from the ATS facilityCARE program.

2018 Baseline kWH Usage Comparison — Continuous Improvement

2018 Baseline kWH Usage Comparison Graph

 

Allen Institute for Brain Science ATS Project

Allen Institute for Brain Science

June 12, 2014

Major neuroscience research facility that consists of six stories and 245, 000 sq. ft. ATS installed Alerton controls on the AHUs and central utility plant plus Phoenix air valves were installed in the Critical Research spaces. Project was awarded LEED Gold.

 

Infectious Disease Research Institute Project

Infectious Disease Research Institute (IDRI)

June 12, 2014

The Infectious Disease Research Institute (IDRI) project consists of a multi-floor, complex, research laboratory tenant improvement in an existing, occupied, multi-tenanted building. Laboratory spaces include Biosafety Level 3 and Animal Biosafety Level 3 (BSL-3 and ABSL-3) suites, cGMP clean rooms, vivarium, cage wash rooms, QC suites, general research laboratories and lab and office support areas.

ATS installed Alerton controls throughout the project including in all critically pressurized areas.

 

 

199 Blaine ATS Laboratory Project

199 Blaine (Gilead Sciences)

June 12, 2014

199 East Blaine Street (Gilead Sciences) is a life sciences and biotech laboratory facility encompassing approximately 180, 000 sq. ft. including 60, 000 ft2. of underground parking. The building is a state-of-the-art, sustainable, green building designed with functional and energy efficiencies and systems integration. The building incorporates high efficiency chillers and boilers, non-chemical water treatment systems, recycled materials, as well as many other environmentally protective features.

ATS installed an Alerton BACnet control system throughout the building and created custom graphics to make managing this complicated building as efficient as possible. Project was awarded LEED® Gold.

 

Footer

Featured Projects

Providence Regional Medical Center
Central Washington University
Hyatt Hotel and Olive 8 Residences

Seattle Area Office: 450 Shattuck Avenue South, Renton, WA 98057 • (425) 251-9680

Boise Office: 10951 W. Emerald Street, Boise, ID 83713 • (208) 887-9696

Centennial Office: 8200 S Akron Street, Ste. 117, Centennial, CO 80112 • (303) 799-1887

Atlanta Office: 10 Mansell Ct. E, Suite 200, Roswell, GA 30076 •  (770) 649-6100

Spokane Office: 9507 E. Sprague, Spokane Valley, WA 99206 • (509) 892-1000

 

Top
Copyright © 2023 ATS Automation, all rights reserved. Website by Sundog Media, LLC Logo Sundog Media, LLC · Privacy Policy · CCPA Policy · RGA Machine Readable Files