• Skip to primary navigation
  • Skip to main content
  • Skip to footer
  • RE-OPEN STRATEGIES
  • Careers
  • ATS Companies
  • (425) 251-9680
  • Facebook
  • LinkedIn
  • Constant Contact
  • Search

ATS Automation

Smart Building Control Systems Serving Western and Central Washington

Building Solutions


  • Controls
  • Energy Optimization
  • Service
  • Home
  • About
    • ATS Companies
    • Vision & Values
    • Team
    • Community
    • Careers
    • Testimonials
  • Solutions
    • Construction
    • Critical Facilities & Data Centers
    • Energy Management
      • Washington Clean Buildings Performance Standard (HB-1257)
    • Smart Building Solutions
      • FacilityAI Autonomous Optimization
    • Consulting Services
  • Support
    • 24/7 Service
    • Service Programs
    • Training
    • Operational Tech
      • FacilityHost
      • FacilityShield
  • Projects
  • Products
  • Contact
  • (425) 251-9680
  • Facebook
  • LinkedIn
  • Constant Contact

Hospitality/Cultural Projects

Hospitality/Cultural

Renaissance Hotel Controls Project

Renaissance Hotel

June 12, 2014

This renovation project includes a hotel, condominiums, and a retail area. ATS provided Alerton controls for the common areas, and the central plant made up of hot water boiler, DWH, Fluid Cooler with pumping systems.

 

Hotel Monaco ATS Project

Hotel Monaco

June 12, 2014

The award-winning Hotel Monaco, located in downtown Seattle, tasked ATS with investigating, developing and implementing energy-saving measures with a financial payback of five years or less. ATS not only reduced Hotel Monaco’s energy consumption while upgrading the Alerton Energy Management and Control System, but provided a financial payback of 2.4 years with a 41% return on investment for the project.

Download Full Case Study

 

Hyatt Hotel and Olive 8 Residences ATS Project

Hyatt Hotel and Olive 8 Residences

June 12, 2014

This mixed use project consists of 39 total floors including 22 floors of residential units, a full scale luxury spa /gym with pool and a 17 story Hyatt hotel and parking garage. ATS installed Alerton controls in all common areas and for the central plant, AHUS and garage units.

 

 

Lemay Car Museum Project

Lemay Car Museum

June 12, 2014

This 4-story automotive history museum is 165, 000 ft2  and boasts 15 galleries, an education center, theater, administrative offices, banquet and meeting halls, lobby and gift shop. LeMay’s curved roof and architectural design presented unique challenges including the use of sound attenuation and the placement of rooftop units and VAVS.

 

Husky Stadium ATS Project

Husky Stadium

June 12, 2014

Originally built in 1920, this 72, 500-seat Seattle icon has been completely renovated. The 70, 000 ft2 Football Operations Building will be pursuing LEED Gold Certification as part of the project.

ATS installed Alerton controls on RTUs with BACnet integration, HRU systems, nearly 200 VAVs, Makeup Air systems and a condensing water system.

 

 

Footer

Featured Projects

Providence Regional Medical Center
Central Washington University
Hyatt Hotel and Olive 8 Residences

Seattle Area Office: 450 Shattuck Avenue South, Renton, WA 98057 • (425) 251-9680

Boise Office: 10951 W. Emerald Street, Boise, ID 83713 • (208) 887-9696

Centennial Office: 8200 S Akron Street, Ste. 117, Centennial, CO 80112 • (303) 799-1887

Atlanta Office: 10 Mansell Ct. E, Suite 200, Roswell, GA 30076 •  (770) 649-6100

Spokane Office: 9507 E. Sprague, Spokane Valley, WA 99206 • (509) 892-1000

 

Top
Copyright © 2023 ATS Automation, all rights reserved. Website by Sundog Media, LLC Logo Sundog Media, LLC · Privacy Policy · CCPA Policy · RGA Machine Readable Files