• Skip to primary navigation
  • Skip to main content
  • Skip to footer
  • RE-OPEN STRATEGIES
  • Careers
  • ATS Companies
  • (425) 251-9680
  • Facebook
  • LinkedIn
  • Constant Contact
  • Search

ATS Automation

Smart Building Control Systems Serving Western and Central Washington

Building Solutions


  • Controls
  • Energy Optimization
  • Service
  • Home
  • About
    • ATS Companies
    • Vision & Values
    • Team
    • Community
    • Careers
    • Testimonials
  • Solutions
    • Construction
    • Critical Facilities & Data Centers
    • Energy Management
      • Washington Clean Buildings Performance Standard (HB-1257)
    • Smart Building Solutions
      • FacilityAI Autonomous Optimization
    • Consulting Services
  • Support
    • 24/7 Service
    • Service Programs
    • Training
    • Operational Tech
      • FacilityHost
      • FacilityShield
  • Projects
  • Products
  • Contact
  • (425) 251-9680
  • Facebook
  • LinkedIn
  • Constant Contact

Healthcare Projects

Healthcare

Providence Regional Medical Center ATS Project

Providence Regional Medical Center

June 12, 2014

New Cymbaluk Tower

ATS Automation provided a complete BACnet control system for the recently completed 680,000 square foot PRMC patient tower expansion building which expands hospital services within a rapidly growing region and consolidates the largest emergency department service in the State of Washington into a single operationally efficient, patient-centered care facility. ATS controls the Air Handling Units, Central Utility Plant, Surgery Suites, and Patient Rooms. Phoenix valves were installed on the supply and return air ducts in every patient room.

 

 

Virginia Mason & Benaroya Research ATS Project

Virginia Mason & Benaroya Research

June 12, 2014

Virginia Mason Medical Center is comprised of multiple buildings including the Benaroya Research Institute, Jones, Buck and Lindeman Pavilions. It holds a 336-bed teaching hospital. The Center recently built a new patient tower that is 342, 000-SF and 14 stories that included five below-grade floors for emergency fuel storage, a central utility plant and future operating room space. The nine-story concrete structure above-grade incorporates a new emergency department, a patient bed floor and shell space for future tenant improvements. An interstitial floor serves each tenant floor below. A sky bridge and connections to the adjacent hospital tower at each floor were included in the project. Alerton controls and/or monitors the patient rooms, central utility plant with steam and condensate, medical gas, chilled water, hot water heating and condenser water.

ATS also replaced a legacy Siemens system in the Benaroya Research Institute with Alerton and the JCI system in the existing hospital and CUP.

 

Good Samaritan Hospital Project

Good Samaritan Hospital

June 12, 2014

Major hospital project that consists of nine stories, 350,000 sq. ft., hospital tower, a central utility plant upgrade with a connecting tunnel between the CUP and the new hospital building and a parking garage.  Good Sam Patient Care Tower is the first hospital in Washington State to achieve LEED Silver.  The HVAC system reduces energy consumption by utilizing low-velocity ducting, high-efficiency chillers and mid-building air handlers.  In addition, 100% outside air for optimum infection control, heat recovery system further contributes to the building’s energy conservation measures. ATS installed Alerton controls on the AHUs and central utility plant plus Phoenix air valves were installed in the patient rooms. Project received LEED Sliver rating.

 

EvergreenHealth Medical Center Project

Evergreen Medical Center

June 12, 2014

Evergreen Medical Center – Redmond is a 49, 074 ft2. 3-story primary and critical care facility with a level III trauma center, diagnostic imaging and laboratory / surgical services. Patients are served by 16 fully-equipped emergency care rooms, 5 urgent care rooms and 31 primary care exam rooms. On-site diagnostic imaging services include MRI, CT scan and X-ray. ATS provided Alerton controls throughout including pressurization controls in critical spaces.

 

Footer

Featured Projects

Providence Regional Medical Center
Central Washington University
Hyatt Hotel and Olive 8 Residences

Seattle Area Office: 450 Shattuck Avenue South, Renton, WA 98057 • (425) 251-9680

Boise Office: 10951 W. Emerald Street, Boise, ID 83713 • (208) 887-9696

Centennial Office: 8200 S Akron Street, Ste. 117, Centennial, CO 80112 • (303) 799-1887

Atlanta Office: 10 Mansell Ct. E, Suite 200, Roswell, GA 30076 •  (770) 649-6100

Spokane Office: 9507 E. Sprague, Spokane Valley, WA 99206 • (509) 892-1000

 

Top
Copyright © 2023 ATS Automation, all rights reserved. Website by Sundog Media, LLC Logo Sundog Media, LLC · Privacy Policy · CCPA Policy · RGA Machine Readable Files